Automatic rinse-fill-cap
Understand the three operations, see selected catalog ratings and check your bottle and cap against the proposed platform.
Allot Tech · Water bottling equipment
Choose a water bottling machine around your bottle, required output and equipment scope. Explore automatic rinsing, filling and capping equipment, then decide whether you also need water treatment, PET bottle making, labeling and packing. Allot Tech helps clarify the requirements and coordinate a project-specific supplier proposal.



Start with your machine requirement
For PET still water, a rinser-filler-capper is the core machine. Treatment, bottle making and finished-pack handling depend on your existing equipment and supply plan.
Understand the three operations, see selected catalog ratings and check your bottle and cap against the proposed platform.
Choose bought-in bottles or on-site bottle making, identify existing machines and define what treatment, labeling and packing you need.
Prepare the bottle, output and scope, then check the selected supplier’s machine evidence, exclusions, test method and support responsibilities.
The XGF references below combine rinsing, filling and capping for PET water bottles. The catalog rates output on a 500 ml reference bottle. These figures help start a supplier discussion; they do not confirm production on your bottle, current availability or the complete equipment package.
| Catalog reference | Published output | What to confirm for your purchase |
|---|---|---|
| XGF14-12-5 | 6,000 BPH | Actual bottle/cap fit, required good output and included accessories |
| XGF24-24-8 | 13,000 BPH | Format parts, water supply, conveyors and the agreed test conditions |
| XGF50-50-15 | 24,000 BPH | Bottle-specific output and which upstream/downstream equipment is supplied |
A filling-machine price and a complete equipment-package price describe different purchases. Bottle formats, requested output, cap handling, change parts, treatment, blowing, labeling, packing and site services all affect what is being quoted. Ask for one equipment list with included, optional, buyer-supplied, excluded and unresolved items clearly separated.
For a useful first enquiry, send your country, water product, bottle/cap details, required output and the equipment you already have. An unknown input can remain open with a confirmation step; it should not become an invented specification or a firm price.
Allot Tech (Suzhou) Co., Ltd. helps clarify machine requirements, communicate equipment-sourcing questions and coordinate project-specific proposals. Mr Kcal is the public contact. Manufacturing, engineering, testing and site-service responsibilities must be assigned to the parties that actually undertake them.
Start with the machine and bottle requirement, then review the proposed supplier's evidence and quotation. The catalog photographs identify equipment categories; they do not establish ownership of every pictured factory or guarantee the final project configuration.
Allot Tech catalog equipment
Use these images to identify the machine category, then confirm the final model and specification against your water, bottle, output, pack and factory conditions.
Image source: user-supplied Allot Tech Beverage Bottling Catalog 2026. Equipment shown is a catalog reference, not a claim of final project configuration.
Direct supplier answer
A useful supplier quotation identifies the proposed equipment and manufacturing resources, states the bottle-specific performance basis, defines every package boundary, and links the price to documents, FAT, delivery and support responsibilities. A model name and total price alone are not enough.
Function, model or platform, quantity, actual manufacturing resource, confirmed options and permitted substitutions.
Clarify who supplies each machineReference bottle, closure, required good output, test boundary, assumptions and project-specific confirmation status.
Normalize capacity claimsIncluded modules, interfaces, utilities, controls, documents, spares, site work and buyer-side items.
Define responsibilityFAT method, deviation closure, shipment release, installation handoff, warranty and after-sales escalation.
Plan evidence gatesEquipment-package scope
The stages below are a procurement checklist, not a universal final configuration. For every required function, record the supplier, manufacturing resource, interface owner, evidence and commercial state.
A supplier is more than a price sender
Supplier evaluation should show what is confirmed, what evidence supports it and what still requires project-specific review.
Product, container, closure and treatment route match the proposed machine platform.
Every supplier prices from the same inclusion list, output basis and utilities boundary.
Models, drawings, materials, component brands and consumptions are documented.
Upstream and downstream rated speeds include realistic efficiency and accumulation assumptions.
Samples, run duration, acceptable stops, inspection records and acceptance criteria are agreed.
Supply, installation, commissioning, travel, local labor and utilities are assigned by party.
Layouts, manuals, electrical drawings, BOM, recommended spares and wear parts are listed.
Currency, validity, payment, exclusions, delivery basis, warranty and change control are explicit.
Machine only or coordinated package
Compare the same interfaces, evidence and acceptance ownership whether you buy one machine or ask one party to coordinate several equipment sources.
| Decision area | Machine-only purchase | Coordinated equipment package |
|---|---|---|
| Existing assets | Identify upstream and downstream machines, utilities and controls. | Identify site utilities, building work and any buyer-supplied systems. |
| Integration | Assign mechanical, electrical and control interfaces to named parties. | Confirm which interfaces are coordinated, engineered, tested or merely communicated by the package supplier. |
| Acceptance | Test the machine and its agreed interfaces. | Define separate machine tests, interface evidence and any package-level release decision. |
| Price comparison | Include change parts, transfer, installation and controls work. | Normalize exclusions, utilities, options and site-service costs. |

Evidence boundary
The 2026 Allot Tech catalog supports the water-treatment path, XGF filling-platform reference and downstream equipment categories used here.
Project route
Each stage creates a record that the next stage can verify.
Confirm water, bottle, cap, pack, output, site and destination.
Use one scope and rating basis across candidate suppliers.
Resolve models, interfaces, drawings, utilities and deviations.
Test the signed scope with agreed samples, records and criteria.
Close documents, spares, packing, shipment and site responsibilities.
Four practical tools
No tool creates a final technical parameter or price. Each one prepares a clearer supplier conversation.
Build a preliminary equipment list and missing-information register.
Open toolFind missing scope, acceptance, document and commercial fields.
Open toolScore eight evidence and responsibility dimensions.
Open toolCreate a copyable project summary without inventing specifications.
Open toolBefore requesting a quotation
Start with the equipment you need, then confirm the supplier, scope and evidence.
The core filling step normally uses rinsing, filling and capping equipment. Prepared water, empty-bottle supply, labeling and final packing are separate scope decisions. If you buy ready-made bottles, a PET blow molder is not automatically required.
That must be confirmed for the actual bottle and cap designs, handling parts and settings. Ask for a format-by-format response and output basis; a published 500 ml rating is not a confirmed 1.5 L rating.
The proposed model, output, bottle formats, accessories, equipment boundary and services can differ. Request a project-specific itemized quotation and compare inclusions and exclusions on the same basis.
Send your country, water product, bottle and cap information, required output, requested equipment, existing machines, label/final pack and known site utilities. Mark uncertain inputs as open so the supplier can identify the next confirmation step.
Project handoff
Share the bottle, output, machine scope and what is still uncertain. Allot Tech can coordinate the next technical clarification.